unheeding
14.09.2012, 06:29
Hey guys,
i have to give this assignment to my teacher and he takes off points if
you spent a certain amount of time on the drawing (he's going to use
time command). what i need to do is take everything on my file (model
AND layouts) and put it on another file where my time (date created,
spent time, editing time ect.) is perfect. i know that my file will
count that as the "last time modified" but it won't matter.
So basically i am going to delete what is on the "good time" file and
replace it with everything from the other one. How do i do that?? In the
end it has to be the same drawing with the same layouts but with
different time/date settings.
Please don't tell me it's cheating i'm actually a good student, but this
counts for a huge part of my semester and i really need to get the best
grade i can!
THANKS
i have to give this assignment to my teacher and he takes off points if
you spent a certain amount of time on the drawing (he's going to use
time command). what i need to do is take everything on my file (model
AND layouts) and put it on another file where my time (date created,
spent time, editing time ect.) is perfect. i know that my file will
count that as the "last time modified" but it won't matter.
So basically i am going to delete what is on the "good time" file and
replace it with everything from the other one. How do i do that?? In the
end it has to be the same drawing with the same layouts but with
different time/date settings.
Please don't tell me it's cheating i'm actually a good student, but this
counts for a huge part of my semester and i really need to get the best
grade i can!
THANKS